Creating Meters
  
  
    - 
        To create a meter, use the following
                    command:
        
create meter meter-name
          
       - 
        To display the meters already configured on the switch,
          use the command:
        
show meter meter_name
       
    ExtremeXOS now creates 8 to 16 default ingress meters that are used for per-port
      metering. These are named "ingmeter<n>" where n is 0-15.